Skip to content
TIME Technologia TIME Technologia

Geology and exploration

eSim, Enhanced Satellite Imagery, is our patented system: satellite data analysed against the resonance signature of particular deposits, for accurate and specific data.

  • Defining the conditions of the ore base for various minerals, and the beneficiation of mining and chemical raw materials
  • Geomechanics of useful arrays, and study of the physical and mechanical characteristics of mining rocks
  • Specialisation in gold and iron ore deposits

Planning

  • Chemistry and design for mining-chemical production and beneficiation processes
  • General schemes for developing the mining industry in the region; global planning
  • Working out primary technical and economic proposals
  • Business planning

Construction and rehabilitation

  • Transportation systems: truck roads, conveyors and tramlines
  • Processing and beneficiation factories for mineral resources (mining and chemical raw materials, coal, polymetals), ore processing and flotation concentration
  • Tunnels and underground construction
  • Reconstruction of railways, motor roads, electric power transmission, communications, pipelines and sewerage systems

Mining machinery

  • Producing mining machinery
  • Designing and building plants that manufacture mining machinery
  • Grinding and sorting equipment and complexes
  • Innovation: producing new and innovative machinery and equipment

Technical audit

  • Determining the condition of mining equipment: stationary installations, mine lifts, ventilators and compressors

Environmental protection

  • Ecological expertise, specialised in evaluating the natural and technological risks of developing mining projects
  • Re-cultivation, purification and restoration of mining lands, so that they become suitable for growing crops and gardening
  • Clarification of industrial water for utility and amenity use

The ore base, at nano level

At nano level, the conditions of ore base formation and the physical and mechanical characteristics of the rock tell us exactly what the composition is, and the best way to minimise losses of the valuable product during beneficiation.

How eSim reads the ground first

Scanning electron micrograph of gold at nano scale: fine bright particles scattered densely across a fractured mineral surface.
A nano gold image.

The full schedule of services

Seven people in orange coveralls and hard hats standing together in an arched underground coal mine tunnel, with a ventilation duct along the left wall and a lamp overhead.
Underground coal mine inspection, Sumatra, Indonesia, 2008 — the first project, and how it all began.

Geology and exploration

  • Defining the conditions of the ore base for various minerals, and the beneficiation of mining and chemical raw materials
  • Geomechanics of useful arrays, and study of the physical and mechanical characteristics of mining rocks
  • Specialisation in gold and iron ore deposits
  • Geological research specialised in mining-chemical feedstock
  • Estimation of mineral resource and ore beneficiation potential

Planning

  • Chemistry and design for mining-chemical production and beneficiation processes
  • General schemes for developing the mining industry in the region; global planning
  • Working out primary technical and economic proposals
  • Business planning
  • Re-equipment and modernisation of old coal mines
  • Electrification schemes
  • Transportation schemes
  • Construction schemes
  • Development projects for building motor transport factories, and transport repair and maintenance factories
  • Projects for automating industrial control
  • Research and development work for mining-chemical engineering and ore beneficiation

Construction and rehabilitation

  • Transportation systems: truck roads, conveyors and tramlines
  • Processing and beneficiation factories for mineral resources (mining and chemical raw materials, coal, polymetals), ore processing and flotation concentration
  • Tunnels and underground construction
  • Reconstruction of railways, motor roads, electric power transmission, communications, pipelines and sewerage systems
  • Underground mining and new types of roof support
  • Reconstruction of existing coal mines
  • Construction of beneficiation factories
  • New construction
  • Projects for reconstructing and building new housing complexes, medical facilities, civil structures, sports facilities and agricultural infrastructure
  • Communications and fire alarm installation
  • Acting as general contractor
  • Open-pit mining
  • Closure of coal mining enterprises with no prospects
  • Construction of repair facilities
  • Processing of technogenic-mineral formations (tailings) after mining gold, platinoids, copper, polymetal and rare-earth deposits, for rich concentrates and barren tailings for innovative products; concentration of useful components (technogenic deposits) alongside the development of the primary deposits
  • Coal, potassium, gold and iron ore mining

Mining machinery

  • Producing mining machinery
  • Designing and building plants that manufacture mining machinery
  • Grinding and sorting equipment and complexes
  • Innovation: producing new and innovative machinery and equipment
  • A tracked cutting machine with several yellow rotary cutting heads across its front.
  • A tracked machine with a grey body and a yellow cutting head on a raised boom.
  • A cutting machine with a white body and yellow cutting drums at both ends.
  • A cutting machine with orange rotary cutting heads at its front.
  • A drilling rig on crawler tracks, its white boom carrying a yellow drill feed.
  • A tracked cutting machine with a blue body and orange rotary cutting heads.
Underground cutting and drilling machinery.

Technical audit

  • Determining the condition of mining equipment: stationary installations, mine lifts, ventilators and compressors

Environmental protection

  • Ecological expertise, specialised in evaluating the natural and technological risks of developing mining projects
  • Re-cultivation, purification and restoration of mining lands, so that they become suitable for growing crops and gardening
  • Clarification of industrial water for utility and amenity use

The future of mining is not to prohibit mining but to reclaim and clean the land it leaves, to a level that suits agriculture. We know how to re-balance the ecosystem and restore harmony.

We don’t inherit the earth from our ancestors, we borrow it from our children.

Native American proverb

How we work with you

On a consultancy arrangement, TIME can raise the capacity of an existing enterprise and cut its losses, with tailor-made solutions for problems in current operations and for transportation and the beneficiation process.

We are open to alliances, strategic partnerships and joint ventures, and can act as technical and scientific partner or contractor: from project initiation and feasibility studies, through the supply of mining machinery and turnkey services, to the transfer of technology to local workers.

Loading the page